Cranes

The complete operation cycle of harbor cranes is approximately one minute. During this time, the harbor crane requires variable amounts of reactive energy, fluctuating rapidly throughout the entire crane cycle.

Category:

Description

The Elspec Equalizer’s real-time power factor correction system:
  • Eliminates reactive energy in real time
  • Provides voltage control
  • Reduces the current and voltage flicker
  • Allows installation of a smaller service (less cable, less heat)
  • Lowers system losses
  • Saves energy

See Case Study Distributing Generation
See Case Study Equalizer Santos Port Brazil

Reviews

There are no reviews yet.

Be the first to review “Cranes”

Your email address will not be published. Required fields are marked *